The improvement phase covers every change made to a detection after it reaches production, up to and including its retirement. It is the phase most programs neglect, and that neglect is what turns a detection catalog into a liability: rules nobody trusts, firing for reasons nobody remembers, read by no one.

Improvement rarely happens through goodwill alone. Analysts are busy, engineers are pulled towards new requests, and a detection that still appears healthy in the console may have stopped working months earlier. The framework therefore defines explicit mechanisms: fixed triggers that open improvement work, a classification of changes by risk, scheduled reviews, automated checks for drift, and a deliberate procedure for retirement.

Running example. Analysts closing alerts from the consent phishing detection recorded a recurring harmless cause: an internal automation account re-approving a Microsoft application each week. That feedback opened an improvement item. It was classified as an exception, the lowest-risk kind of change, and scoped to that one account and application with an expiry date. Because the detection now carried an exception, its review interval shortened to 90 days. See stage 7 of the example.


Triggers

A detection enters the improvement backlog through exactly one of five defined triggers. IMP-1. Every backlog item MUST record which trigger created it.

Trigger Source Detection
T1 Analyst feedback SOC disposition data Precision below threshold, or explicit tuning request
T2 Automated health alert Monitoring Detection silence, log source gap, or performance breach
T3 Validation failure Adversary emulation A previously passing test now fails (detection drift)
T4 Incident retrospective Post-incident review A detection should have fired and did not, or fired with insufficient context
T5 Scheduled review Calendar The detection reached its review date

Triggers T1 to T4 are reactive. T5 is the safety net that catches what the other four miss.

flowchart LR
    T1[Analyst feedback] --> B[Improvement backlog]
    T2[Health alert] --> B
    T3[Validation failure] --> B
    T4[Incident retrospective] --> B
    T5[Scheduled review] --> B
    B --> C{Classify change}
    C --> D[Tune]
    C --> E[Rebuild]
    C --> F[Deprecate]
    D --> G[Regression test]
    E --> G
    G --> H[Controlled deployment]
    F --> I[Decommission]

Closing the feedback loop

The single most common failure in detection engineering is that SOC analysts know a rule is bad and the engineering team never finds out. Goodwill does not close this loop. Workflow does.

IMP-2. An alert MUST NOT be closable in the case management system without a recorded detection disposition. The disposition field MUST offer at minimum:

Disposition Meaning
true-positive Genuine malicious or policy-violating activity
true-positive-benign The activity occurred as described but was authorized
false-positive-logic The detection logic is wrong
false-positive-data The logic is right; the telemetry was wrong, missing or malformed
insufficient-context Could not disposition from the alert; required manual pivoting

The distinction between false-positive-logic and false-positive-data matters because they route to different owners. Logic problems go to detection engineering. Data problems go to the telemetry owner. Collapsing them into one bucket is why so many tuning efforts fail: the team edits a rule that was never the problem.

IMP-3. A disposition of false-positive-logic, false-positive-data or insufficient-context MUST automatically create an improvement backlog item referencing the detection ID. It MUST NOT depend on an analyst choosing to raise one.


Change classification

Not all improvements are equal. IMP-4. Every improvement MUST be classified before work begins, because classification determines the required testing and approval.

Class Description Testing required Approval
C1 Exception Add or remove a specific exclusion Regression test; confirm exception is scoped and time-bound Peer review
C2 Threshold Adjust a numeric threshold, window or baseline Regression test plus backtest over 30 days of historical data Peer review
C3 Enrichment Add context to the alert without changing trigger logic Verify enrichment resolves; confirm no performance regression Peer review
C4 Logic Change the conditions under which the detection fires Full validation suite; adversary emulation re-run Two reviewers; detection owner sign-off
C5 Rebuild Replace the detection approach entirely Treated as a new detection; full lifecycle As for a new detection
C6 Deprecation Retire the detection Coverage impact assessment Detection council

Exceptions are technical debt

Exceptions are the most abused improvement class because they are the fastest. They are also the primary mechanism by which detections silently die: a rule with forty accumulated exclusions is not a detection, it is a monument.

IMP-5. Every exception MUST record a justification, an owner and an expiry date. Exceptions MUST NOT be created without an expiry date.

IMP-6. Expired exceptions MUST be reviewed and either renewed with fresh justification or removed. Automatic silent renewal MUST NOT occur.

IMP-7. A detection whose exception count exceeds the program threshold (default: 10) MUST be escalated for C5 rebuild assessment rather than receiving further exceptions. Persistent need for exclusions is evidence that the detection logic is modeling the wrong thing.


Review cadence

IMP-8. Every detection MUST carry a review_cadence_days and a last_reviewed date in its metadata (see the detection schema). A detection past its review date is in detection debt.

Detection severity Maximum review interval
Critical 90 days
High 180 days
Medium 365 days
Low / informational 365 days
Any detection with an open exception 90 days regardless of severity

IMP-9. The proportion of detections in detection debt MUST be reported monthly. A conforming program at L3 maintains detection debt below 15% of the active catalog.

IMP-10. A conforming program MUST allocate explicit, protected engineering capacity to improvement work. The framework's recommendation is 20-30% of detection engineering capacity. Improvement capacity that is not protected will be consumed by new build requests in every sprint, without exception.

What a review must cover

A scheduled review is not a glance at the rule. IMP-11. A review MUST assess and record each of:

  1. Relevance. Is the threat still credible against this organization? Re-score threat relevance using the planning rubric.
  2. Efficacy. Does the detection still fire on the technique? Evidence MUST be a validation test result, not an opinion.
  3. Precision. Is 30-day precision above threshold? See Detection Metrics.
  4. Robustness. Has the detection drifted down the robustness ladder because of exceptions or environmental change? See Detection Robustness.
  5. Telemetry. Are all required log sources still live, complete and correctly parsed?
  6. Response. Is the linked playbook still accurate, and did analysts actually use it?
  7. Cost. Is query cost, ingest cost and analyst handling cost still proportionate to the risk addressed?

A review that does not produce a recorded decision against all seven points has not happened.


Detection drift

Detection drift is the silent degradation of a detection that still exists, still appears healthy in the console, and no longer works. It is the dominant cause of false confidence in mature programs.

Common causes:

Cause Example
Schema change A vendor renames a field in an agent update; the rule now matches nothing
Parser change A log source is re-onboarded through a different pipeline with different normalization
Volume-based sampling Ingest cost controls begin sampling the source the detection depends on
Environmental change The monitored application is migrated to a platform that emits different telemetry
Exception accumulation Exclusions have grown to cover the attack path itself
Technique evolution The adversary changes tooling; the brittle indicator no longer appears

IMP-12. A conforming program MUST detect drift through automated means. The minimum viable control set is:

  • Scheduled adversary emulation against production, per detection, at an interval no longer than the review cadence.
  • Automated alerting on detection silence and log source liveness (MET-4).
  • Schema conformance checks in the detection pipeline that fail when a referenced field no longer exists in the target platform.

Manual testing does not scale to drift detection and MUST NOT be relied upon as the sole control at L3.


Regression testing

IMP-13. Every improvement MUST pass the detection's existing validation suite before deployment. Tuning that reduces noise by breaking detection is the most damaging possible outcome of this phase, and it is common, because the only metric under pressure at that moment is alert volume.

The validation suite for each detection MUST contain at minimum:

  • One true positive fixture: synthetic or captured telemetry representing the technique, which the detection MUST match.
  • One true negative fixture: benign telemetry resembling the technique, which the detection MUST NOT match.
  • One fixture per accepted exception, confirming the exception suppresses only what it claims to suppress.

See Detection as Code for the pipeline that enforces this automatically.


Controlled deployment

IMP-14. Improvements MUST be deployed through the same controlled path as new detections: staged rollout, alert forecast, and a defined rollback. An improvement is a change to a production control, and the fact that it is intended to reduce noise does not make it low risk.

IMP-15. Every deployed change MUST record the detection version, the change class, the author, the reviewer and the trigger that caused it. Version history MUST be reconstructible from the repository without reference to the detection platform.


Deprecation and decommissioning

A catalog that only grows is a catalog nobody trusts. IMP-16. A conforming program MUST have a deprecation path and MUST exercise it.

Deprecation criteria

A detection SHOULD be deprecated when any of the following hold and no compensating justification is recorded:

Criterion Threshold
Threat no longer relevant Threat relevance re-scored to 1
Superseded A named successor detection provides equal or better coverage
Irreparable precision Precision below threshold after two completed C4 improvement cycles
Telemetry withdrawn A required log source is permanently unavailable and no alternative exists
Cost disproportionate Total cost of ownership exceeds the assessed risk reduction
Preventive control adopted The activity is now reliably blocked and the block is itself monitored

Note what is not on this list: "it never fires." A detection for a low-frequency, high-impact technique is supposed to be silent. Silence is evidence of either absence of the threat or failure of the detection, and only a validation test can distinguish them. IMP-17. A detection MUST NOT be deprecated on the basis of low fire count alone.

The decommissioning procedure

IMP-18. Decommissioning MUST follow this sequence, and each step MUST be recorded:

  1. Coverage impact assessment. Identify every technique, business driver and compliance obligation traced to this detection. Confirm the coverage that will be lost and whether a successor absorbs it.
  2. Stakeholder notification. Notify the SOC, the detection council and the originating requester. Compliance-driven detections additionally require sign-off from the control owner.
  3. Status change to deprecated. The detection remains active but is marked in metadata, and the alert carries a deprecation notice.
  4. Observation period. A minimum of one review cycle in deprecated status before disabling, so that unexpected dependencies surface.
  5. Disable, do not delete. Set status to retired. The detection logic, metadata and full history remain in the repository permanently.
  6. Update the catalog and coverage model. Remove from active coverage reporting. Record the resulting gap if there is no successor.
  7. Retire dependent artifacts. Playbooks, dashboards, automation and enrichment jobs that exist solely for this detection.

IMP-19. Retired detections MUST be retained in version control indefinitely. Deleting a retired detection destroys the audit trail that proves what the organization was monitoring at a point in time, which is frequently the specific question asked after an incident or by a regulator.


Proactive improvement

Everything above is triggered by something going wrong. A mature program also improves detections before anything goes wrong.

  • Continuous adversary emulation. Run the technique library against production on a schedule. Failures become T3 backlog items automatically.
  • Threat intelligence review. When a tracked adversary changes tooling, re-examine every detection mapped to the affected techniques.
  • Robustness promotion. Work detections up the robustness ladder deliberately: convert an indicator match into a behavioral match. See Detection Robustness.
  • Change advisory integration. Subscribe detection engineering to the IT change advisory board. A firewall rule change, an operating system upgrade or an identity provider migration can invalidate detections silently. Bidirectional communication between asset owners and the monitoring team is the cheapest drift control available.

IMP-20. A conforming program at L3 MUST treat asset and platform change notifications as an improvement trigger and assess affected detections before the change lands in production.


In brief

  • Improvement work opens through five defined triggers: analyst feedback, automated health alerts, failed validation, incident reviews, and scheduled review.
  • Analysts cannot close an alert without recording a disposition, and adverse dispositions open improvement items automatically.
  • Changes are classified by risk, from a scoped exception to a full rebuild, and each class has its own testing and approval.
  • Exceptions carry an owner and an expiry. Too many exceptions on one detection signals that its logic needs rebuilding.
  • Detections are reviewed on a schedule set by severity, checked automatically for drift, and retired through a recorded procedure that keeps their history.

Requirements in this chapter

The requirements IMP-1 to IMP-20 appear in the sections above. The specification shows the conformance level of each.

What comes next

Most improvement decisions rest on measurement: whether a detection's alerts are worth an analyst's time, whether it is still alive, and what it costs to run. Detection metrics defines the measures the framework uses and explains why some commonly reported figures are left out.